日韩亚洲一区中文字幕,日韩欧美三级中文字幕在线,国产伦精品一区二区三区,免费在线欧美性爱链接

      1. <sub id="o5kww"></sub>
        <legend id="o5kww"></legend>
        <style id="o5kww"><abbr id="o5kww"></abbr></style>

        <strong id="o5kww"><u id="o5kww"></u></strong>
        1. ____ 202 km Shanghai-Hangzhou high-speed railway, with ____ design speed of 350 km per hour, began
          its operation on Oct 26, 2010.

          A. The; a
          B. The; the
          C. A; a
          D. A; the
          A
          請在這里輸入關(guān)鍵詞:
          相關(guān)習題

          科目:高中英語 來源:0127 模擬題 題型:單選題

          ____ 202 km Shanghai-Hangzhou high-speed railway, with ____ design speed of 350 km per hour, began
          its operation on Oct 26, 2010.
          [     ]
          A. The; a
          B. The; the
          C. A; a
          D. A; the

          查看答案和解析>>

          科目:高中英語 來源:陜西省西工大附中2011屆高三第四次適應(yīng)性訓(xùn)練英語試題 題型:016

          _________ 202 km Shanghai-Hangzhou high-speed railway, with _________ design speed of 350 km per hour, began its operation on Oct 26, 2010.

          [  ]

          A.The; a

          B.The; the

          C.A; a

          D.A; the

          查看答案和解析>>


          同步練習冊答案